PROJECT: NSWCCD Detachment Bremerton Consolidation P-364
Hayre McElroy & Associates is providing M.E.P code compliance oversight during construction of a 22,380 square foot
combined laboratory building. The project includes: A new 22,380 square foot combined laboratory building, including two
prefabricated buildings on the pontoon. Site development includes a 100 stall paved parking area, pier to a floating
pontoon, and extension of existing base utilities at the Naval Base Kitsap. Addition of HVAC systems include; plumbing
and gas systems; fire protection systems, anti-terrorism force protection, card swipe/electronic keypads. The project
oversight and quality assurance inspection and testing includes:
- Pre-con/progress meetings
- Underground transmission and distribution
- In-slab mechanical and electric inspection
- High voltage primary electrical
- Mechanical systems installation/HVAC
- Inspection of transformers