PROJECT: Steam Distribution Replacement

The project located at the Fort Lewis Army Base consists of replacement of the existing steam and HW distribution mains, which includes direct bury work and main replacement within existing underground concrete utility corridors. The project includes: replacing piping and valves in existing vaults and manholes; providing new utility corridors, providing bypass lines; providing temporary rental boilers and connections, temporary electrical tie-ins, and temporary water tie-ins; providing restoration of asphalt concrete pavement at roadways and parking areas. The project oversight and quality assurance inspection and testing includes: