PROJECT: First Park at Meridian
Hayre McElroy & Associates is contracted to provide special inspection and material testing services for proposed construction, consisting
of a three (3) building 459,000 sq ft tilt-up concrete structural frame project. Building construction will include cast-in-place foundation
concrete, cast-in-place tilt-up panel walls, and structural steel framing. Inspection oversight and quality assurance includes:
- Structural Concrete
- Concrete Tilt-up Construction
- Structural Masonry
- Epoxy Anchors
- Structural Steel Welding
- Light Gage Steel Framing