PROJECT: Ironwood at Harbour Pointe
Hayre McElroy & Associates provided special inspection and materials testing of a 120,000 sq ft five story
condominium project adjacent to and north of the club house at Harbour Pointe Golf Course. The 48-unit project
consists of four levels of residential area constructed of cold form steel framing system above a one level of
concrete parking structure partially below grade. Materials testing and inspection oversight included:
- CIP Reinforced Concrete
- Structural and Post-tensioned concrete
- Structural shotcrete
- Seismic hold-downs and anchors
- Lateral wood framing