PROJECT: Everett North Middle School
Hayre McElroy & Associates contracted as sub-consultant to HWA Geosciences provided special inspection and materials
testing services during construction of a new Sports Gymnasium, and locker facilities at the Everett North Middle School.
The project included decorative CMU block on exterior wall facing. Inspection oversight and quality assurance included:
- Structural masonry
- Structural concrete
- Structural steel welding
- Steel fabrication shop inspection