PROJECT: Puyallup High School East Campus Phase I
Hayre McElroy & Associates as prime consultant is providing quality assurance of special inspection and materials testing services,
including geotechnical engineer of record services to Puyallup School District No. 3. The proposed construction will consist of a
new 21, 931 sq ft classroom building on the existing high school campus. Duties include geotechnical engineering and special inspection
of site utilities, asphalt paving, auger cast building foundations, cast-in-place reinforced concrete, reinforced structural masonry
walls, and steel framing and fabrication.
- Geotechnical engineer of record
- Auger-cast pile foundations
- Utilities and sitework concrete
- TESC
- Asphalt Paving
- CIP Reinforced concrete
- Lateral wood field framing
- Seismic hold-downs and anchors
- Structural steel welding and bolting
- Slab moisture emission testing